Very early this morning a truck unloaded all of the materials needed for the retaining wall. 

This delivery included:

  • 4 pallets of Sleepers (approx 60 sleepers)
  • A crate of post covers and post caps
  • approximately 25 posts, and
  • Cement mix to fix the posts

Soon after delivery, the contractors arrived and they they really got moving with and drilling the remaining post holes and fitting the first few posts.

The next few days will be focused on constructing the retaining wall and installing some of the drainage required. Should be an interesting week!